July 5, 2025 • 600 Block
Crews remove the back structure and all of the remaining studs at 635 Cleveland Street.
Read moreCrews pour a concrete slab around the installed grease traps at the Peoples Bank building, completing another key step in the building’s infrastructure work.
Read moreJuly 3, 2025 • Brown Brothers
Crews remove large sections of wood framing inside the Brown Brothers Building, clearing the way for structural upgrades.
Read moreJuly 2, 2025 • F.W. Woolworth Co.
Crews are removing temporary interior shoring from the first and second floors of the Woolworth Building.
Read moreJuly 1, 2025 • 600 Block
Crews remove the outer brick from the chimney, uncovering the original brickwork.
Read moreJune 30, 2025 • Peoples Bank
Crews reinforce the exposed west wall of the Peoples Bank building with concrete blocks and begin framing new utility corridors.
June 29, 2025 • The Telephone Building
A new slab now supports safer service entry at the Telephone Building.
Crews start the process of removing interior stucco at Brown Brothers, revealing the wall structure beneath.
Read moreCrews start building the elevator shaft at the Woolworth building, with the first course of reinforced concrete block ready for concrete infill.
Read moreJune 26, 2025 • 600 Block
Crews remove all non-load-bearing studs inside 639 Cleveland Street, preparing for new framing and future renovations.
Read moreJune 25, 2025 • Peoples Bank
Structural steel installation is completed inside the historic Peoples Bank building, reinforcing the structure.
Read moreContractors complete a weeklong installation of rooftop solar panels at the Telephone Building.
Read moreJune 23, 2025 • Brown Brothers
Crews remove demolition debris from the Brown Brothers Building, including wood, gypsum and plaster.
Read moreJune 22, 2025 • F.W. Woolworth Co.
Restoration teams clear a steel truss from the Woolworth building’s second floor, removing a major obstacle to interior leveling.
Read moreCrews remove the outdated tile floor inside 629 Cleveland Street, setting the stage for upcoming renovation work.
Read moreGrease traps installation completes beneath the ground-floor slab at the Peoples Bank building.
Read moreJune 19, 2025 • The Telephone Building
Mural installation completes on the east face of the historic Telephone Building to highlight Clearwater’s past and present.
Read moreJune 18, 2025 • F.W. Woolworth Co.
At the Woolworth building, steel frames are being installed to support a new historically styled, hurricane-rated storefront system.
Read moreJune 17, 2025 • 600 Block
All bathrooms and plumbing systems are removed at 635 Cleveland Street, clearing the way for installation of new copper plumbing.
Read moreJune 16, 2025 • Brown Brothers
Crews remove the interior walls at the Brown Brothers Building to reveal the original framework.
Read more