See daily progress on Historic Cleveland Street
January 27, 2026 • Peoples Bank
Drywall work begins on the first floor of the Peoples Bank building, with crews measuring and laying out the interior spaces.
Read moreJanuary 25, 2026 • F.W. Woolworth Co.
Protective shellac is applied to exposed woodwork inside the Woolworth building.
Read moreJanuary 21, 2026 • F.W. Woolworth Co.
Interior progress at the Woolworth building includes durable, environmentally conscious flooring.
Read moreJanuary 20, 2026 • Peoples Bank
Ceiling framing on the second floor of the Peoples Bank building begins to define future office and tenant spaces.
Read moreJanuary 17, 2026 • F.W. Woolworth Co.
Interior finishing continues at the Woolworth building with baseboards added to future tenant spaces.
Read moreJanuary 11, 2026 • F.W. Woolworth Co.
Dark wood wall panels are added inside the elevator cab at the Woolworth building, giving the interior an authentic 1930s-inspired look.
Read moreJanuary 10, 2026 • Peoples Bank
Framing and drywall work are underway on the first floor of the Peoples Bank building, beginning to define the interior layout as restoration continues.
Read moreJanuary 9, 2026 • F.W. Woolworth Co.
The Woolworth building moves closer to completion as crews apply the final coat of paint to the interior walls.
Read moreJanuary 3, 2026 • Peoples Bank
Drywall installation is underway on the second floor, helping shape the office spaces at the Peoples Bank building.
Read moreJanuary 2, 2026 • F.W. Woolworth Co.
The final stages of the interior restoration include mudding and smoothing the walls at the Woolworth building.
Read moreDecember 29, 2025 • F.W. Woolworth Co.
Solid wood bathroom doors, partitions and 1930s-style hardware are now installed inside the Woolworth building, reinforcing the restored interior’s historic character.
Read moreDecember 27, 2025 • F.W. Woolworth Co.
Interior décor at the Woolworth building now includes framed scenes from its early retail days.
Read moreDecember 24, 2025 • Peoples Bank
Crews install drywall around the elevator landing at the Peoples Bank, preparing the area for paint.
Read moreDecember 23, 2025 • F.W. Woolworth Co.
New lobby signage adds both function and craftsmanship to the Woolworth building interior.
December 20, 2025 • F.W. Woolworth Co.
Interior spaces become more complete as ceiling tiles go in at the Woolworth building.
Read moreDecember 15, 2025 • Peoples Bank
Concrete floor preparation is underway at the Peoples Bank building where the east storefront will be installed.
Read moreDecember 8, 2025 • F.W. Woolworth Co.
Detailed door framing work continues inside the Woolworth building.
Read moreDecember 5, 2025 • F.W. Woolworth Co.
Crews are laying flooring upstairs in the Woolworth building, installing floor planks, cutting edge pieces for a clean fit and creating a durable surface for future use.
Read moreDecember 4, 2025 • F.W. Woolworth Co.
Crews install dark wood wainscoting in the Woolworth building lobby, adding 1930s-inspired detail to the restored interior.
Read moreDecember 3, 2025 • Peoples Bank
Carpenters completed building the east staircase frame at the Peoples Bank building.
Read more