See daily progress on Historic Cleveland Street
April 17, 2026 • Peoples Bank
Structured rows of resilient channels mark the next stage of interior restoration at the Peoples Bank building.
Read moreApril 15, 2026 • Peoples Bank
The Peoples Bank building begins to regain its Mediterranean Revival character as barrel roof tiles are installed in precise rows.
Read moreApril 14, 2026 • Peoples Bank
A defining interior element takes shape as patterned tile flooring extends through the Peoples Bank building corridor.
Read moreThe awning structure takes shape at the Peoples Bank building as crews fine-tune alignment and secure each connection point.
Read moreApril 10, 2026 • Peoples Bank
The Peoples Bank façade is re-emerging as temporary scaffolding systems are removed from the site.
Read moreApril 7, 2026 • Peoples Bank
The next layer of the Peoples Bank façade takes shape with the installation of tile panel mounting systems.
Read moreApril 5, 2026 • Peoples Bank
Precision framing work continues as crews install the metal ceiling grid throughout the Peoples Bank interior.
Read moreApril 3, 2026 • Peoples Bank
Electricians are advancing the lighting system at the Peoples Bank building, completing connections and positioning fixtures within the ceiling framework.
Read moreMarch 31, 2026 • Peoples Bank
Tile installation advances to the east façade of the Peoples Bank building, as crews continue installing the custom terracotta frieze that restores a key 1920s architectural feature.
Read moreMarch 30, 2026 • Peoples Bank
Behind the walls, the electrical system is coming together at the Peoples Bank building, thus setting the stage for lighting and power.
Read moreMarch 28, 2026 • Peoples Bank
Critical infrastructure is coming together as HVAC installation continues inside the Peoples Bank building.
Read moreMarch 26, 2026 • Peoples Bank
Interior walls begin to form as metal stud framing establishes the layout of future tenant spaces at the Peoples Bank building.
Read moreMetal framework installation is shaping the future air distribution system inside the Peoples Bank building.
Read moreThe Peoples Bank building is regaining its 1920s character as crews begin installing the recreated mosaic tile frieze along the façade of the historic structure.
Read moreMarch 22, 2026 • Peoples Bank
Specialists install brass cladding to define the east-facing entryway of the Peoples Bank Building, reintroducing materials common to early commercial storefronts.
Read moreMarch 21, 2026 • Peoples Bank
Suspended metal framework is installed to support the Peoples Bank building’s new HVAC system, preparing the space for efficient air distribution.
Read moreMarch 20, 2026 • Peoples Bank
Custom tile signage replicating the original 1920s Peoples Bank building design is being installed, with each panel precisely anchored and aligned to restore the historic façade.
Read moreMarch 18, 2026 • Peoples Bank
A tiled wall is taking shape at the east entrance of the Peoples Bank building while exterior restoration work continues.
Read moreRows of solar panels are being mounted across the Peoples Bank roof, bringing modern energy technology to the historic landmark.
Read moreExterior trim work continues on the Peoples Bank building as crews attach Hardie board panels that shape the building’s façade.
Read more