Announcement: Award-Winning Tampa Hospitality Group Tastes Pretty Good Expands to Downtown Clearwater Read →
Don’t miss what’s happening on Cleveland Street

Get updates as new projects and events unfold

Don’t miss what’s happening on Cleveland Street
Cleveland Street Alliance

Peoples Bank

See daily progress on Historic Cleveland Street

Detail work continues on the Peoples Bank Building as restoration crews apply sealant between the exterior terracotta tiles, refining and protecting the historic façade.

Read more

Interior restoration work inside the Peoples Bank Building enters another detailed phase as custom millwork and trim are installed throughout the stairwell.

Read more
MORE PHOTOS

Ceiling wiring installation continues across the Peoples Bank Building as electricians prepare the structure for future lighting and interior systems.

Read more
MORE PHOTOS

Interior finishing moves forward inside the Peoples Bank Building as crews complete detailed tile work across one of the building’s patterned wall features.

Read more

Decorative ceiling features and restored wall surfaces come together inside the Peoples Bank Building as crew members complete detailed touch-up work throughout multiple rooms.

Read more
MORE PHOTOS

Interior base trim installation is underway throughout multiple finished areas of the Peoples Bank Building, giving a defining edge to each room.

Read more
MORE PHOTOS

Interior spaces inside the Peoples Bank building take on their finished appearance as painting crews move room by room through the restoration.

Read more
MORE PHOTOS

Specialists apply plaster to interior wall panels inside the Peoples Bank building, adding texture and a decorative finish to the restored space.

Read more
MORE PHOTOS

Concrete floor preparation work is underway inside the Peoples Bank Building as crews scrape away remaining adhesive and surface coatings throughout the structure.

Read more
MORE PHOTOS

Newly painted walls and corridors begin to reveal the restored interior layout inside the Peoples Bank Building restoration project.

Read more
MORE PHOTOS

Drywall sanding progresses inside the historic Peoples Bank Building as crews prepare the renovated interior for primer, paint and finish work.

Read more
MORE PHOTOS

The Peoples Bank Building interior gains color, texture and architectural depth through a carefully grouted terracotta tile frieze.

Read more

Above the ceiling grid at the Peoples Bank building, copper refrigerant lines are joined through precision brazing—an essential step in the building’s HVAC installation.

Read more
MORE PHOTOS

Historic brickwork and modern steel framing come together inside the Peoples Bank Building as staircase rail installation progresses.

Read more
MORE PHOTOS

The second floor of the Peoples Bank Building receives drywall finishing, marking a visible step in the ongoing restoration of this 1910 landmark on Cleveland Street.

Read more
MORE PHOTOS

Precision framing work continues inside the Peoples Bank Building, establishing clean lines for walls and window openings.

Read more
MORE PHOTOS

The cantilevered awning at the Peoples Bank Building receives detailed finishing, with crew members coating each panel and support.

Read more
MORE PHOTOS

Tile installation is underway at the Peoples Bank Building, as crews align and secure interior wall finishes in the second-floor restrooms.

Read more
MORE PHOTOS

Exterior finish work sharpens the historic look of the Peoples Bank Building’s roof overhang.

Read more
MORE PHOTOS

Mechanical installation is taking shape inside the Peoples Bank Building as specialists begin assembling new air distribution components.

Read more