January 2, 2026 • F.W. Woolworth Co.
The final stages of the interior restoration include mudding and smoothing the walls at the Woolworth building.
Read moreJanuary 1, 2026 • Peoples Bank
The south side of the Peoples Bank building is progressing with plastering and waterproofing.
Read moreDecember 31, 2025 • F.W. Woolworth Co.
The Woolworth building’s interior now features newly installed brass drinking fountains.
Read moreDecember 30, 2025 • Peoples Bank
Another key milestone is completed with the installation of south storefront doors and glass at the Peoples Bank building.
Read moreDecember 29, 2025 • F.W. Woolworth Co.
Solid wood bathroom doors, partitions and 1930s-style hardware are now installed inside the Woolworth building, reinforcing the restored interior’s historic character.
Read moreDecember 28, 2025 • Peoples Bank
Crews install tinted, heat-treated glass in the east storefront doors at the Peoples Bank building, improving future safety and comfort.
Read moreDecember 27, 2025 • F.W. Woolworth Co.
Interior décor at the Woolworth building now includes framed scenes from its early retail days.
Read moreDecember 26, 2025 • Peoples Bank
Behind-the-scenes work is underway to protect the Peoples Bank building from future water intrusion.
Read moreDecember 25, 2025 • F.W. Woolworth Co.
Exterior lighting installation brings a finished look to the Woolworth building’s storefront.
Read moreDecember 24, 2025 • Peoples Bank
Crews install drywall around the elevator landing at the Peoples Bank, preparing the area for paint.
Read moreDecember 23, 2025 • F.W. Woolworth Co.
New lobby signage adds both function and craftsmanship to the Woolworth building interior.
December 22, 2025 • Peoples Bank
Street-level progress continues with storefront doors installed at the Peoples Bank building.
Read moreDecember 21, 2025 • Peoples Bank
Work continues on the Peoples Bank building as steel ledges prepare the façade for mosaic tiles.
Read moreDecember 20, 2025 • F.W. Woolworth Co.
Interior spaces become more complete as ceiling tiles go in at the Woolworth building.
Read moreDecember 19, 2025 • F.W. Woolworth Co.
Final paint preparation brings the Woolworth building storefront closer to its finished look.
Read moreDecember 18, 2025 • Peoples Bank
Crews craned new air-conditioning units onto the roof of the Peoples Bank building, marking a major milestone in the building’s mechanical upgrades.
Read moreDecember 17, 2025 • F.W. Woolworth Co.
Drywall and mudding work reintegrates the windows back into the Woolworth building interior.
Read moreDecember 16, 2025 • F.W. Woolworth Co.
Brass hardware is now in place on the Woolworth building storefront doors.
Read moreDecember 15, 2025 • Peoples Bank
Concrete floor preparation is underway at the Peoples Bank building where the east storefront will be installed.
Read moreDecember 14, 2025 • F.W. Woolworth Co.
Painters applied the final dark green coat to the Woolworth Building’s southwest entryway, completing the historically inspired finish around the windows and doors.
Read more