See daily progress on Historic Cleveland Street

MORE PHOTOS

Crews rebuilt the front parapet of the Woolworth building, lowering it to its historical height and reusing original bricks to preserve the structure’s historic character.

Read more
MORE PHOTOS

Crews at the Woolworth building are framing the first floor to form stable walls for the next phase of restoration.

Read more
MORE PHOTOS

A layer of concrete strengthens and soundproofs the Woolworth building’s second floor.

Read more
MORE PHOTOS

Crews apply a stucco coat with reinforcing mesh on the Woolworth building’s west wall to ensure durability and crack resistance.

Read more
MORE PHOTOS

At the Woolworth building, roofing materials were delivered and staged for the next phase of restoration.

Read more
MORE PHOTOS

Raised wood curbs installed on the Woolworth Building roof will secure skylights and improve efficiency.

Read more
MORE PHOTOS

The roof replacement at the Peoples Bank begins with the arrival of key materials.

Read more
MORE PHOTOS

Metal framing is installed around the structural beams at the Peoples Bank building, adding strength and preparing the walls for upcoming finishing procedures.

Read more
MORE PHOTOS

Restoration continues at the Woolworth Building as crews remove parapet bricks by hand and set them aside for reuse.

Read more
MORE PHOTOS

Crews at the Peoples Bank building completed electrical installation by placing junction and outlet boxes on new framing.

Read more
MORE PHOTOS

Crews completed installation of roof decking at the Woolworth building, replacing trusses and preparing for an upgraded roof system.

Read more
MORE PHOTOS

Restoration of the Brown Brothers Building uncovers original brick walls on the second floor.

Read more
MORE PHOTOS

Metal framing crews are making rapid progress at the Peoples Bank building, with wall structures taking shape on both the first and second floors.

Read more
MORE PHOTOS

Selected interior wall studs are being removed from the Brown Brothers Building following the stripping of drywall and stucco finishes.

Read more
MORE PHOTOS

Truss inspections begin as crews remove the ceiling at 635 Cleveland Street.

Read more
MORE PHOTOS

Crews remove demolition debris from the Brown Brothers Building, including wood, gypsum and plaster.

Read more
MORE PHOTOS

A duct is added to the first-floor AC at the Telephone Building to help reduce noise and create a quieter space for future tenants.

Read more

A portion of the roof at Peoples Bank was removed and replaced with angled planks and sheathing, both of which encourage proper stormwater drainage.

Read more
MORE PHOTOS

Crews have begun leveling the second floor in preparation for the installation of a new floor system at the Woolworth building. 

Read more
MORE PHOTOS

Paint removal continues at the Brown Brothers Building. Crews discovered that much of the front façade brick remains unpainted, and it will be preserved in its original state.

Read more