December 20, 2025 • F.W. Woolworth Co.
Interior spaces become more complete as ceiling tiles go in at the Woolworth building.
Read moreDecember 15, 2025 • Peoples Bank
Concrete floor preparation is underway at the Peoples Bank building where the east storefront will be installed.
Read moreDecember 8, 2025 • F.W. Woolworth Co.
Detailed door framing work continues inside the Woolworth building.
Read moreDecember 5, 2025 • F.W. Woolworth Co.
Crews are laying flooring upstairs in the Woolworth building, installing floor planks, cutting edge pieces for a clean fit and creating a durable surface for future use.
Read moreDecember 4, 2025 • F.W. Woolworth Co.
Crews install dark wood wainscoting in the Woolworth building lobby, adding 1930s-inspired detail to the restored interior.
Read moreDecember 3, 2025 • Peoples Bank
Carpenters completed building the east staircase frame at the Peoples Bank building.
Read moreDecember 2, 2025 • F.W. Woolworth Co.
A key cooling component is now in place as crews connect the indoor AC unit at the Woolworth building.
Read moreNovember 29, 2025 • F.W. Woolworth Co.
Guide rails and wiring are being set as the Woolworth building elevator installation moves forward.
Read moreNovember 27, 2025 • F.W. Woolworth Co.
Electrical crews install and test all first floor outlets at the Woolworth building, connecting wiring, securing fixtures and completing final safety checks.
Read moreNovember 24, 2025 • F.W. Woolworth Co.
The coffered ceiling and wall edges at the Woolworth building are now being framed with period-appropriate dark wood trim.
Read moreNovember 22, 2025 • F.W. Woolworth Co.
Electricians route and secure conduit across the second floor of the Woolworth building, creating the pathways for future wiring and lighting in the restored office space.
Read moreNovember 21, 2025 • Peoples Bank
Demolition is complete and reconstruction is getting underway on the east staircase at the Peoples Bank building.
Read moreNovember 20, 2025 • F.W. Woolworth Co.
Crews finish drywall installation on the Woolworth building’s second floor, smoothing and sealing the walls to prepare the office spaces for paint and final finishes.
Read moreNovember 19, 2025 • Peoples Bank
The new elevator cab at the Peoples Bank building has been fully assembled, with guide rails, drive systems and interior components installed.
Read moreNovember 16, 2025 • F.W. Woolworth Co.
Historic color returns to the Woolworth building as crews complete interior painting in the lobby.
Read moreNovember 12, 2025 • F.W. Woolworth Co.
Crews install a historically accurate coffered tin ceiling at the Woolworth building, bringing to life a 1920s design element that decorates the building’s lobby.
Read moreNovember 10, 2025 • F.W. Woolworth Co.
Progress continues inside the Woolworth building as crews install drywall throughout the second-floor creative office space.
Read moreNovember 6, 2025 • F.W. Woolworth Co.
The Woolworth building’s first-floor walls are taking shape as crews start the drywall finishing process.
Read moreNovember 5, 2025 • F.W. Woolworth Co.
Crews install recycled denim insulation on the Woolworth building’s second floor, ensuring a safe, sustainable and well-insulated office environment.
Read moreNovember 3, 2025 • Peoples Bank
Crews install flexible metal conduit and wiring throughout the Peoples Bank building, routing lines for lighting and outlets as part of the electrical rough-in phase.