Plumbing crews installed a cast-iron storm drainage system at the Peoples Bank building, ensuring reliable water runoff management for the restored landmark.

Read more
MORE PHOTOS

Crews remove the north-side lath-and-plaster walls on the second floor of the Brown Brothers Building, revealing an earlier construction method tougher than drywall.

Read more
MORE PHOTOS

Wooden trusses are lifted by crane and secured atop the Woolworth building, preparing the structure for decking and installation of a durable waterproof roof.

Read more
MORE PHOTOS

Crews removed sections of brick at 635 Cleveland Street to examine the building’s integrity, revealing structural concerns that require stabilization.

Read more
MORE PHOTOS

Metal framing crews are making rapid progress at the Peoples Bank building, with wall structures taking shape on both the first and second floors.

Read more
MORE PHOTOS

Masons have laid concrete block and begun installing the brick façade on the Woolworth building, ensuring it matches the historic appearance of the structure.

Read more
MORE PHOTOS

Selected interior wall studs are being removed from the Brown Brothers Building following the stripping of drywall and stucco finishes.

Read more
MORE PHOTOS

Truss inspections begin as crews remove the ceiling at 635 Cleveland Street.

Read more
MORE PHOTOS

Chalk lines and spray paint are used to mark the wall locations at Peoples Bank, starting the framing work.

Read more
MORE PHOTOS

Restoration crews rebuilt the south parapet of the F.W. Woolworth Co. building, adding a continuous bonding beam and installing framing to support sheathing and stucco.

Read more

Sound- and temperature-insulated plumbing is removed from the upstairs of 639 Cleveland Street.

Read more
MORE PHOTOS

Crews remove several dozen second-floor wooden doors and frames not slated for restoration as part of the Brown Brothers Building transformation. 

Read more
MORE PHOTOS

Second-floor copper water lines are being installed at the Peoples Bank building with a press-fit system for secure, efficient connections.

Read more
MORE PHOTOS

Crews are removing selected storefront bricks from Woolworth to prepare for replacement masonry that blends seamlessly.

Read more
MORE PHOTOS

An HVAC inspection conducted at the Brown Brothers Building is a preparatory step ahead of full system removal.

Read more
MORE PHOTOS

Another layer of demolition completes, preparing the interior for its next stage of construction.

Read more
MORE PHOTOS

Trusses connecting the Woolworth stairwell towers to the second floor are secured in place, preparing the building for decking installation.

Read more
MORE PHOTOS

Plumbers have started rough-in work on the second floor of the Peoples Bank, following the completion of underground lines. Crews are dry-fitting pipes and preparing for final connections.

Read more
MORE PHOTOS

Restoration continues at 615 Cleveland as the non-structural walls on the second floor are being removed to prepare for the next phase of restoration.

Read more
MORE PHOTOS

After stripping drywall and stucco, demolition crews removed the entire wood framing system inside 635 Cleveland Street.